Back to projects
Residential Home 2024

Semi-Detached House — Construction

Insulation and rendering of a semi-detached house during construction. White-graphite silicone render with glass balustrades.

Okolice Krakowa
320 m²

About the Project

Facade work on a semi-detached house during construction. Graphite polystyrene insulation was applied and finished with silicone render in a white-graphite color scheme.

Scope of Work

  • ETICS insulation system — 200mm graphite polystyrene
  • Silicone render in two shades
  • Glass balustrade installation
  • Sheet metal flashings and window sills

Like this project?

Contact us to discuss your project.

Free Quote